Building log

27-May-2008
Brakes
Catégorie: Fuselage : Cabin

Today, I begun working on the brake equipment by installing some of the fittings. Here the left side with the black hoses going to the parking brake valve and the white hoses coming from the right pedales.



Here, the white hoses between the two pedal sets. The end of the hoses are not finished as once done the bolt won't go through the bushing in the rib/



I also installed the fittings on the parking brake valve.




Working time on this subpart
Today :  1h (Total : 158h)

Lectures (2191)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami