Building log |
![]() |
29-Feb-2008
Elevator rigging
|
Today I worked on the elevator rigging, and most of the work is taking place in the cabin. First I installed the smaller of the two pushrods. It is a bit tricky to install, and I still have to insert some washers on the bolts. Here is the bellcrank, the rod from the cabin is bolted to the lower hole, and the upper hole gets the big rod going to the elevator. It took quite a while to have everything in place, and I still have to bolt everything. The stick is not vertical with the elevators in neutral position, I don't know if it's normal or not. I'll check on other websites, and I can then modify the rigging a bit. I then had a better look at the rudder rigging and did some work on the rudder stops. Working time on this subpart Today : 2h (Total : 147h) |