Building log |
![]() |
14-Feb-2008
Small parts
|
As I'll soon begin the installation of the empennage, I decided to fabricate a few small parts that will be needed: two shims and the elevator stop. Before drilling the elevator stop I put it into position on the fuselage, to make sure I will be drilling without compromising the edge distances on the fuselage longerons. Working time on this subpart Today : 1h (Total : 52h) |
Lectures (2613)