Building log |
30-Jan-2008
Plumbing still
|
I found the correct tubing bender so I fabricated the three tubes needed on the fuel pump. I went quite well, I only had to redo one, and forgot no sleeve and no nut. The I prepare the line going from te pump to the firewall. I still have to finish the firewall end as I don't know the entry point. Working time on this subpart Today : 3h (Total : 127h) |
Lectures (2671)