Building log

24-Jan-2008
Battery box..bis
Catégorie: Engine : Firewall forward

Working again on the battery box, all the holes have to be deburred and dimpled. Next the box in installed on the firewall. To do this, some rivets have to be drilled out.



Under the battery box, battery and starter relay have to be installed. There are some more rivets to drill out, and a doubler to cut and drill. On the picture, everything is in postion but the drilling has still to be done.





Working time on this subpart
Today :  2h (Total : 4h)

Lectures (2445)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami