Building log

22-Dec-2007
Brakes
Catégorie: Fuselage : Cabin

After some cleaning and rearranging of the workshop, I tackked the brake assembly. They just came back from being anodized (thanks Antoine). The riveting is not a big deal.



Then I begun intsalling the brake cylinders, but the plans are not very clear so I just installed the springs that will help the brakes return to the neutral position as it seems the internal spring is sometimes a bit too weak.



The workshop is closed during Chistmas time.
Merry Christmas

Working time on this subpart
Today :  1h (Total : 104h)

Lectures (2148)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami