Building log |
13-Dec-2007
Assembling small parts
|
I had to work on the parts that got primed yesterday. First I riveted all the nutplates and then riveted the parts together where it was possible. Then I reassembled the aileron trim, I'll install it in the fuselage later. And I finished by priming the interior of the elevator control rods. I used Van's method, capping one end, pouring some primer, capping the second end and shaking the rod. To have the primer dry I took the rods into the house. Working time on this subpart Today : 2h (Total : 102h) |
Lectures (2245)