Building log

08-Nov-2007
Fuel selector
Catégorie: Fuselage : Cabin

I installed the fuel selector; its an Andair selector looking more robust and safer than the one supplied by Vans.



Then I begun working on the rollbar. The part is quite complex and there are four rollbar quarts to be assembled. The two rear parts have to be drilled to 1 1/2 inches.



Then two liaising parts have to be fabricated and drilled. I still have some angles to cut and drill before beginning the assembly.



Working time on this subpart
Today :  2h (Total : 54h)

Lectures (2477)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami