Building log

28-Oct-2007
Miscellaneous
Catégorie: Fuselage : Cabin

Next thing to do is drill the main gear support an legs. To avoid having the legs stuck in the support all tye parts get thouroughly sanded.



Here the result with the bolt inserted.



I the fabricate the elevator pushrods, there are two of them : one small from the stick to the bellcarank in the fuselage and one from the bellcrank to the elevator. To drill the ends I use the usual trick, by using a piece of adhesive with equidistant marks.



Here the two pushrods ready for priming.




Working time on this subpart
Today :  3h (Total : 45h)

Lectures (2292)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami