Building log |
![]() |
27-Oct-2007
Still working on the flaps
|
The flap installation is going on with the match drilling of the covers. I also installed and tested the flaps motor, but forgot to take a picture. Then I had to drill, deburr, dimple and countersink for the numerous nutplates that have to be installed. Here are two on the firewall recess. In the end a bunch of parts that have to be primed. To end taday's session, I cut and tapped the two flap push rods that will connect the tube in the fuselage with the flap. The tapping has to be made very slowly and the result looks quite flimsy but is as per plan. Working time on this subpart Today : 4h (Total : 42h) |
Lectures (2393)