19-Sep-2007
Floors
|
As I have to wait for a partner to rivet the forward fuselage, I decided to work on the floors. There are six of them where the holes need to be drilled out and dimpled. Next time I'll sand and prime them. On the forward floors a small part has to be fabricated from aluminum sheet, it will hold the stick boot. It makes for good training to open a rectangular hole in a piece of aluminum. Even if the required precision id not very high, it allows to see errors not to be done when making the holes in the instrument panel for example. Working time on this subpart Today : 3h (Total : 9h) |