Building log |
26-Aug-2007
Seatbacks..still
|
Today, I fabricated the second seatback, it was finished in less time that the first one. Then the two seatbacks were disassembled to be prepared for painting. Working time on this subpart Today : 2h (Total : 5h) |
Lectures (2289)