Building log |
15-Aug-2007
Rudder and brakes
Catégorie: Fuselage : Forward fuselage
|
I begun the installation of the brake and rudder pedals. In fact I only managed to find all the parts in the workshop, mark those that need to be cut or drilled. I then had a thorough look at the install as with the fuselage upside down you have to be careful not to confuse left-right and up-down. Working time on this subpart Today : 1h (Total : 31h) |
Lectures (2482)