Building log

15-Aug-2007
Rudder and brakes
Catégorie: Fuselage : Forward fuselage

I begun the installation of the brake and rudder pedals. In fact I only managed to find all the parts in the workshop, mark those that need to be cut or drilled. I then had a thorough look at the install as with the fuselage upside down you have to be careful not to confuse left-right and up-down.




Working time on this subpart
Today :  1h (Total : 31h)

Lectures (2482)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami