Building log |
![]() |
26-Jul-2007
Drilling
Catégorie: Fuselage : Forward fuselage
|
I did all the drillings in the forward fuselage : the rear to center fuse junction, the skin to bulheads holes and the outer rib holes (visible on the picture with all the copper clecos). Then I drilled the armrest (a picture from inside). I could not resist trying to position the firewall. The drilling of that part will be next. Working time on this subpart Today : 2h (Total : 6h) |
Lectures (2613)