Building log

30-Apr-2007
Dimpling
Catégorie: Fuselage : Center part

Today, I begun dimpling the center fuselage parts. I did all the holes I could reach with the pneumatic squeezer, this leaves all the holes on reachable with the C-frame to be done.
Then I removed the small tags bearing the parts number, when there is no blue plastic, the tag is glued to the aluminum and a pain to remove.




Working time on this subpart
Today :  2h (Total : 22h)

Lectures (2616)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami