Building log

11-Apr-2007
Drilling.. again
Catégorie: Fuselage : Rear part

Still drilling the aft fuse, but before I had to realign the small aft skin I had problems with a few days ago. This meant unclecoing and clecoing 50 or so clecos between each iteration before getting a satisfactory setting.




Working time on this subpart
Today :  3h (Total : 11h)

Lectures (2635)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami