Building log |
![]() |
10-Apr-2007
Drilling
|
Today I worked in small sessions; first I needed almost two hours to square the aft fuselage. The pictures show the method I used. Then I drilled the J-channels. First by drilling one hole out of five, putting in the cleco and then drilling the remaining holes. Here is a picture of the first step. And the interior after the second step. Working time on this subpart Today : 4h (Total : 8h) |
Lectures (2529)