Building log

15-Mar-2007
Sanding
Catégorie: Empennage : Tip

The results of my first work with epoxy was not very good, I think it's due to the low temperature in my workshop.
I managed to get the lower rudder tip work quite good by storing the rudder in the house. Today I sanded this part, which still needs some more work and also reinstalled the famous strobe light nuts.




Working time on this subpart
Today :  1h (Total : 8h)

Lectures (2705)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami