Building log

12-Mar-2007
Sanding
Catégorie: Fuselage : Bulkheads

Tomorrow, the weather may allow a priming session. So I decided to do some prepping of the bulkheads i.e deburring and sanding.
I also corrected a small default on the bulkheads, the slots that will get the main fuselage longeron are too narrow so I filed them to correct size.




Working time on this subpart
Today :  1h (Total : 43h)

Lectures (2988)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami