15-Apr-2006
Rear spar
Catégorie: Empennage : Hor. stab.

Today is the first day of aircraft building. It begins with the aft spar for the horizontal stabilizer. First I prepared the skins by taking of the blue plastic sheet, they I clecoed them to the half spar.



Then I drilled the holes to the correct diameter. The spar is then deburred and dimpled. Next step was to prepare the two reinforcing bars and assemble everything with the copper colored clecos. At the end I drilled to size the holes fixing all this together.



Next session will be on tuesday, I have some real work this week-end.

Working time on this subpart
Today :  4h (Total : 4h)