Building log |
![]() |
12-Feb-2007
Main bulkhead..bis
|
Today, I worked on the main bulkhead. First I backdrilled into position the four rib supports on the forward side. As there are some nutplates ont the bulkhead, I countersunk the rivet holes. There are also nutplates on the supports, and on the two stiffeners I made out of some aluminium angle. There is some interference on some of teh bushing. My solution was to carefully saw a slit in the bushing and then install the interfering part. Then I installed the angles that will support the control column on the backside of the bulkhead. The I cut the optionnal lightening cut, here is the result. I finished the session by deburring all the parts. Working time on this subpart Today : 2h (Total : 31h) |
Lectures (2417)