Building log

12-Jan-2007
Firewall
Catégorie: Fuselage : Bulkheads

Today, I begun working on the firewall. There is a total of 27 parts to be installed (and I did not install the fuel pump doubler). There are only a few parts to fabricate, among them to angles cut from some angle stock. Here are the raw angles:



After almost one hour of cutting and grinding, here they are finished.



The angles need to be 3/32" from the bottom of the firewall, I used my reamer to mesure this and then backdrilled all the holes.



Here is the firewall with everything installed, all the holes have been back drilled.




Working time on this subpart
Today :  3h (Total : 5h)