Articles
Other informations
Galeries
All the pictures
Building log
From metal to plane
In flight
Taking wings
Home
Building log
02-Dec-2006
Second light
Catégorie:
Wings
:
Leading edge
I cut out the leading edge for the second light.
Then I squared again the spar and begun installing the left leading edge.
Working time on this subpart
Today : 1h (Total : 29h)
Lectures (3404)
Précédent
|
Suivant
Status (30 apr 2012)
Time :
2270
hours
In progress
Done
To come
Subparts
Miscellaneous
(14)
Workshop
(11)
Tools
(1)
Empennage
(6)
Hor. stab.
(15)
Vertical stab.
(8)
Rudder
(8)
Elevator
(15)
Tip
(38)
Wings
(7)
Flaps
(7)
Ailerons
(13)
Main spar
(8)
Ribs
(7)
Rear spar
(3)
Skeleton
(14)
Skins
(10)
Leading edge
(20)
Fuel tanks
(40)
Final assembly
(31)
Wingtips
(14)
Fuselage
(5)
Bulkheads
(28)
Rear part
(29)
Center part
(21)
Longeron
(6)
Forward fuselage
(36)
Cabin
(111)
Upper fuselage
(13)
Finishing
(6)
Wiring
(100)
Canopy
(71)
Landing gear
(45)
Engine
(7)
Firewall forward
(81)
Cowls
(52)
Propeller
(13)
Panel
(43)
Assembly
(48)
Main menu
Accueil
Flying
Building log
Archives
Photo album
Articles
Search
Recherche avancée