Building log

22-Nov-2006
Closing
Catégorie: Wings : Fuel tanks

Today, I begun closing the left tank. It's not difficult but quite long. On the picture, the rear baffle is in position. See all the clecos that will have to be cleaned.



And here, four hours later. The Z-brackets are pop riveted, and their orientation is better checked twice as it would be quite difficult to dissassemble later. For this tank I still have to install the fuel gauge and the inspection door cover.




Working time on this subpart
Today :  4h (Total : 76h)

Lectures (2863)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami