Building log |
![]() |
14-Nov-2006
Tubing
Catégorie: Wings : Fuel tanks
|
Today I finished the inboard rib, I installed the pick-up tubes, the vent line and return line fittings. First I had to apply a Vans Service Bulletin requesting to safety wire the pick-up linre nuts. Here is a picture of both sides. Then I installed the fittings. I then inspected and cleaned everything. The tanks are now on hold as I'm waiting for the tools to torque the nuts before closing. Working time on this subpart Today : 3h (Total : 72h) |
Lectures (2974)