| Building log |
|
07-Nov-2006
|
Second leading edge
Catégorie: Wings : Leading edge
|
Rieveted the second leading edge. Working time on this subpart Today : 2h (Total : 22h) |
Lectures (3045)
| Building log |
|
|
Second leading edge
Catégorie: Wings : Leading edge
|
Rieveted the second leading edge. Working time on this subpart Today : 2h (Total : 22h) |
| Time : 2270 hours |
![]() |
|
In progress |
|
Done |
|
To come |
Miscellaneous(14)
Workshop(11)
Tools(1)
Empennage(6)
Hor. stab.(15)
Rudder(8)
Elevator(15)
Tip(38)
Wings(7)
Flaps(7)
Ailerons(13)
Main spar(8)
Ribs(7)
Rear spar(3)
Skeleton(14)
Skins(10)
Leading edge(20)
Fuel tanks(40)
Final assembly(31)
Wingtips(14)
Fuselage(5)
Bulkheads(28)
Rear part(29)
Center part(21)
Longeron(6)
Forward fuselage(36)
Cabin(111)
Upper fuselage(13)
Finishing(6)
Wiring(100)
Canopy(71)
Landing gear(45)
Engine(7)
Firewall forward(81)
Cowls(52)
Propeller(13)
Panel(43)
Assembly(48)