Building log |
![]() |
20-Sep-2006
Deburring..3
|
Today, while I was drilling the fuel tanks, Sabine deburred the external part of both upper wing skins. Work is 90% done. Working time on this subpart Today : 1h (Total : 8h) |
Lectures (2829)