It's october again, time for an annual. Today Sabine helped me to wrap up everything. For two days I had been disassembling and reassembling the plane.(I think there are almost 300 screws to undo to gain access to the innards) I found nothing very important ; a tiny fuel leak near the fuel filter, the pitot bolts needed to be retorqued, the nowe wheel brake out force modified and the landing light grounded again that was all. The rivets, bolts, nuts and pins where all at the same position I had mounted them. Then a first engine start with cowlings removed to check for leaks. The once evrything is back in place a complete test run to wheck all the parameters. Now I have to find a mean to drive out the little owl that is living part time in the hangar. I'm quite happy to have covers.
|